Development of a Program for an Automated Bill of Materials for Engineers

Geraldine B. Mangmang, Rec Alfonso P. Cinco

Abstract


To account or the impacts on construction projects, estimates must be thoroughly designed,planned,procured,and managed. This study sought to develop a system that will generate an automated bill of materials with cost estimates. The study was conducted using developmental evaluation design. The researcher applied the ISO/IEC 25010:2011 software standard for measuring and evaluating system and software product quality both existing and the new software to be developed in this study. Performance of the existing and developed system was compared using quality in use model particularly efficiency,and flexibility,and the product quality model specifically performance efficiency, and functional suitability. Data in this study were gathered within Southern Leyte Province. The Microsoft Visual Studio 2012 software and Microsoft SQLServer2005 database management application,embody the new system. Results revealed that the developed automated bill of materials achieved specific goals with satisfaction, flexibility, performance efficiency, and performance suitability. Successful investigation in the manual preparation offers an opportunity to innovate a new and accurate system.


Keywords


Challenges, innovation, system,cost estimates preparation

Full Text:

JSET004

References


Akintoye,A.,&Fitzgerald,E.(2000). Asurvey of current cost estimating practices in the UK. Construction Management & Economics,18(2),161-172.

Ashworth, A., & Perera, S. (2015). Cost studiesofbuildings. London: Routledge.

Azhar, S. , Hein, M. , & Sketo, B. (2008). Building information modeling: Benefits, risks and challenges. Proceedings, 44th Associated Schools of Construction NationalConference,Auburn,AL.

Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241-252. Google Scholar.

Clough, R. H., Sears, G. A., Sears, S. K., Segner, R. O., & Rounds, J. L.(2015). Construction contracting: A practical guide to company management. Canada: JohnWiley&Sons.

Culler, D. E., & Burd, W. (2007). A framework for extending computer aided process planning to include business activities and computer aided design and manufacturing (CAD/CAM) data retrieval. Robotics and Computer-Integrated Manufacturing,23(3),339-350.

Eastman, C., Eastman, C. M., Teicholz, P., & Sacks, R. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers,engineers and contractors.Canada: John Wiley & Sons.

Enshassi, A., Mohamed, S., & Madi, I. (2015). Cost estimation practice in the Gaza Strip: A case study. IUG Journal of NaturalStudies,15(2).

Gopalakrishnan, P., & Haleem, A. (2015). Handbook of materials management.PHI LearningPvt. Ltd..

Kim, K., & Teizer, J. (2014). Automatic design and planning of scaffolding systems using building information modeling. Advanced Engineering Informatics,28(1),66-80.

Oberlender, G. D., & Trost, S. M. (2001). Predicting accuracy of early cost estimates based on estimate quality. Journal of Construction Engineering and Management,127(3),173-182.

Ratna, S., & Prasad, D. (2014). Integrating Decision Support and Expert Systems for Enhanced Planning, Control And Operational Functions in a Cim Environment. International Journal of Mechanical Engineering and Robotics Research,3(3),437.

Richey, R. C., & Klein, J. D. (2014). Design and development research. In Handbook of research on educational communications and technology (pp. 141-150). NewYork,NY:Springer

Smith, R. C. (2013). Estimating and tendering for building work. London: Routledge.

Stewart, R. D., Wyskida, R. M., & Johannes, J. D. (1995). Cost estimator’s reference manual (Vol. 15). U.S.:John Wiley&Sons.

Trost, S. M., & Oberlender, G. D. (2003). Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), 198-204.

Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., & Alten, S. (2014). Acknowledge-based risk mapping tool for cost estimation of international construction projects. Automation in Construction,43,144-155.


Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.